Monday, 23 May 2011

Solar farm going ahead...

I have written before about the solar array (or whatever it is called) that was proposed for the field to the west of Whiskey Trail Crossing (aka Sandy Lane Crossing).

I hear it is going ahead and the field is pegged out. Construction should be well underway through the summer months.

According to Mike Rigby's Blog http://mikerigby.org/2011/05/18/sandhill-solar-park-work-begins/ the 1.8m perimeter security fence will be placed behind a screen of greenery.

I still prefer a nice meadow behind a nice heritage post and wire fence.

It's a good job there's still going to be a lot of nice countryside either side of the West Somerset Railway between Bishops Lydeard and Minehead.

Sigh...



No comments: