Sunday, 8 February 2009

Rail grinding grinds on

The much awaited report on the so called "wheel/rail interface" problems that beset the West Somerset Railway in 2008 has finally been published. Two documents are being made available to working members and shareholders (not sure about WSRA members though). The bulky document is a report by David Holmes, a consultant engineer, brought in by WSR Plc Vice Chairman David Morgan to investigate the technical issues. The other is a summary by David Morgan, who headed the committee/group charged with looking into the whole episode.

The reports contain most of what folks expect, touching mostly on technical and management. And there are a few lessons learned, notably that works involving third parties should be subject to proper contractual procedures including proper inspection of work done. acceptance and closure, all of which were, incredibly, not done when the rails were treated.

I am not a lover of the phrase "lessons learned" which I hear so often these days - as if it is OK to make and write off mistakes in the pursuit of excellence. Not good enough for 99.9% of what we expect from competent folk.

It's not a "whitewash" but to me because it falls short of explaining exactly how it was allowed to happen. Because it needs to deal with the comptencies and ambitions of people central to the issues. Which is a management problem and not part of the remit.

Delegation was employed to the point of severance of any monitoring. Which, as any scholar of railway building in the 1800s will know, leads only to failure and wasted money.

Interestingly, the reports side-step the question of how much money has been lost.

There seems to be a ground swell of desire to put all this behind us. Fair enough. But only if we can be sure it will not happen again.

We shall see if lessons have, indeed, been learned.










Friday, 25 July 2008

Track trouble

How much damage has been done to the Railway by the recent rail grinding machine? I'm not meaning the actual rails but the fact that it happened at all. No plausible explanation of just how the work was allowed to continue unchecked has been issued by the Railway so we can only sit here and spectulate. I don't think anyone wants a witch hunt, but I do think everyone wants to ensure nothing like this happens again.

And although our visitors have been wonderfully patience and forgiven, the Railway simply does not live up to the Heritage Railway of the Year. Such titles and awards, not long ago, were raining in on a regular basis. The diesel boys have been magnificent, turning out capable machines and crews at short notice, so at least the trains have been kept running. But the Railway attracts visitors because they expect the steam locomotives that the Railway shouts about on all its publicity and promotional material.

There have been times when I have been so ashamed of the debacle that I have considered closing www.wsr.org.uk because I too have been guilty of promoting a product that cannot be delivered. But I chose instead to keep posting what information I could get to allow folks to make their own minds up about trekking out to Lydeard or Watchet to buy their tickets and ride the Minehead Branch.

At the time of writing, the steamers are back and everything seems to be normal again. But there is bad feeling around and some folks will not allow this to be easily forgotten. And if faith is lost...